Ayodhya Ram Mandir 2024 Update: Construction At Full Swing- Check Latest Pictures | India News

0
12
Ayodhya Ram Mandir 2024 Update: Construction At Full Swing- Check Latest Pictures | India News


Ayodhya: The newest photos of Ayodhya’s under-construction Ram Mandir have taken the web by storm as only a glimpse of the temple seems to be grandiose even in its making. The photos had been shared by General Secretary of Shri Ram Janmabhoomi Teerth Kshetra on Twitter. While the temple work is slated for completion in 2024, the images have gone viral on the web. Shri Ram Janmabhoomi Teerth Kshetra’s treasurer, Swami Govind Dev Giri Maharaj, has stated that the murti of Lord Ram Lalla will probably be put in within the temple in January subsequent yr. He additionally revealed that the development of the Ram Temple in Ayodhya is progressing at a fast tempo and is already 70 p.c full.

“At present, the work of Ram temple is 70% complete. By the third week of January 2024, the idol of Lord Ram will be established and arrangements will be made for devotees to visit & offer prayers from that day itself,” he stated.  The basis stone of the under-construction grand Ram temple in Ayodhya was laid by Prime Minister Narendra Modi in August 2020.

Recently, 17,000 granite stones got here from Bharatpur’s Bansi Pahadpur space for plinth development. 80-100 stones reached Ayodhya on daily basis from Rajasthan to hurry up the constructing works. The weight of every stone is roughly 2.50 tonnes. The belief is utilizing fashionable safety instruments for the surveillance of the temple complicated.

The temple has been given an enormous 2.7 acres of land, and it’s anticipated that it could be taller than 160 toes as soon as it’s completed. When it’s completed, will probably be the third-largest Hindu shrine and can have three ranges. The campus can be a treasured location with temples to different Hindu deities as nicely.





Source hyperlink