ISRO moon mission: Chandrayaan 3 spacecraft integrated with launch vehicle

0
23
ISRO moon mission: Chandrayaan 3 spacecraft integrated with launch vehicle


(*3*)

Chandrayaan-3 is India’s third moon mission to show end-to-end functionality in secure touchdown and roving on the lunar floor.

Indian Space Research Organisation (ISRO), which is planning to launch the Chandrayaan-3 moon mission in July, has integrated the spacecraft with the launch vehicle — Launch Vehicle Mark-III (LVM3).

On July 5, ISRO tweeted: Today, at Satish Dhawan Space Centre, Sriharikota, the encapsulated meeting containing Chandrayaan-3 is mated with LVM3.

ISRO has, up to now, not introduced the date of the launch. However, the launch window for the Chandrayaan-3 is between July 12 and 19.

ISRO has, up to now, not introduced the date of the launch. However, the launch window for the Chandrayaan-3 is between July 12 and 19.

ISRO Chairman S. Somanath has mentioned that the area company would choose the earliest doable date to launch the mission.

Chandrayaan-3 is India’s third moon mission, and is a follow-up to Chandrayaan-2, to show end-to-end functionality in secure touchdown and roving on the lunar floor.

Chandrayaan-3 consists of an indigenous lander module (LM), propulsion module (PM), and a rover with an goal of creating and demonstrating new applied sciences required for inter-planetary missions.

According to ISRO, the lander has the potential to comfortable land at a specified lunar website, and deploy the rover, which can perform in-situ chemical evaluation of the lunar floor through the course of its mobility. The Lander and the Rover have scientific payloads to hold out experiments on the lunar floor.

ISRO has integrated the spacecraft with the launch vehicle — Launch Vehicle Mark-III (LVM3), at Satish Dhawan Space Centre, Sriharikota, Andhra Pradesh, on July 5, 2023.

ISRO has integrated the spacecraft with the launch vehicle — Launch Vehicle Mark-III (LVM3), at Satish Dhawan Space Centre, Sriharikota, Andhra Pradesh, on July 5, 2023.

The fundamental perform of PM is to hold the LM from launch vehicle injection until remaining lunar 100-km round polar orbit, and separate the LM from PM. Apart from this, the Propulsion Module additionally has one scientific payload, as a worth addition, which might be operated post-separation of the Lander Module.

After its launch in mid-July, as within the case of India’s earlier moon mission, Chandrayaan-2, the orbital elevating will happen. The lander and orbiter will orbit the moon earlier than touching down on the moon.

Mr. Somanath had earlier mentioned that ISRO has added extra gasoline to the lander, alongside with new tools, and in addition strengthened it. Chandrayaan-3 might be moving into the identical path as its predecessor, and also will be touchdown on the identical website.



Source hyperlink