Karnataka Budget 2023-24: Projects worth ₹9,698 crores announced for comprehensive development of Bengaluru

0
23
Karnataka Budget 2023-24: Projects worth ₹9,698 crores announced for comprehensive development of Bengaluru


Ahead of the upcoming Assembly and Bengaluru civic physique polls, Chief Minister Basavaraj Bommai-led BJP authorities in Karnataka has announced ₹9,698 crore-worth tasks within the State Budget 2023-23 for comprehensive development of Bengaluru metropolis.

On Friday, in his Budget speech, Mr Bommai stated that underneath the Amrutha Nagarothana Scheme, works worth ₹6,000 crore are being applied in Bengaluru. Development of 108 km of roads has been taken up underneath the high-density corridors scheme at an estimated price of ₹273 crore.

After Bengaluru was flooded attributable to heavy rains final yr, “to ensure that there is a free flow of rainwater and to avoid flooding, ₹1,813 crore has been provided for the development of 195 km of drainage and culverts in the city,” he stated.

Around 250 well-equipped ‘She Toilets’ will likely be constructed in closely populated markets, mega industrial complexes, and so forth within the metropolis. State-of-the artwork design together with bathrooms, feeding room, cellular charging, emergency SOS companies and so forth. will likely be taken up at a price ₹50 crore in these complexes.

Measures to ease site visitors

A complete of 75 junctions for site visitors management will likely be developed in Bengaluru at a price of ₹150 crores.
| Photo Credit:
Sudhakara Jain

A complete of 75 junctions for site visitors management will likely be developed in Bengaluru at a price of ₹150 crores, Mr Bommai announced within the Budget. Artificial intelligence will likely be used for seamless sign synchronisation and different capabilities, he stated.

To cut back the site visitors congestion, the federal government proposed building of a 5-km elevated highway at a price of ₹350 crore from Tin Factory to Medahalli and an built-in flyover from Yeshwanthpur railway station to Mathikere and BEL Road by offering direct entry.

Potholes seen on Palace Guttahalli main road in Bengaluru.  file photo

Potholes seen on Palace Guttahalli most important highway in Bengaluru. file picture
| Photo Credit:
BHAGYA PRAKASH Ok

The white topping mission of 120 km arterial roads in Bengaluru at a price of ₹1,000 crore and development of 300 km of arterial and sub-arterial roads within the metropolis at a price of ₹450 crore has additionally been announced for the pothole-filled roads within the metropolis.

The authorities plans to restore roads of 110 villages within the BBMP limits by offering ₹300 crore for their reconstruction. It has additionally proposed a contemporary tech flower market for Bengaluru.

High-powered Bengaluru Metropolitan Land Transport Authority is constituted as a way to coordinate the operations of numerous transport companies and to search out out the scientific cures to mitigate the site visitors issues of the fast-developing metropolis.

To cut back site visitors congestion significantly, building of a satellite tv for pc city ring highway of 288 km of size at a price of ₹13,139 crore has been accepted by the Union authorities. The state authorities has agreed to pay 30% of land acquisition price required for this mission.

Green sign for suburban rail mission, Namma Metro community to develop

A detailed project report for two corridors of Namma Metro with 44.65km length and 31 stations has been submitted to the Union government. The estimated cost is ₹16,328 crore for this project. The work will be taken up after the Centre’s approval

An in depth mission report for two corridors of Namma Metro with 44.65km size and 31 stations has been submitted to the Union authorities. The estimated price is ₹16,328 crore for this mission. The work will likely be taken up after the Centre’s approval
| Photo Credit:
BHAGYA PRAKASH Ok

For correct utilization of Sir M Vishveshwaraiah terminal at Baiyappanahalli, entry roads across the terminal will likely be comprehensively developed and vital works will likely be taken up at a price of ₹300 crore to cut back site visitors congestion.

Third section of works referring to Namma Metro community had been proposed within the earlier price range. An in depth mission report for two corridors of 44.65km size with 31 stations has been submitted to the Union authorities. The estimated price is ₹16,328 crore for this mission. The work will likely be taken up after the Centre’s approval, CM Bommai stated.

Approval has been given by the State authorities and Ministry of Railways for implementation of Bengaluru suburban railway mission at a price of ₹15,767 crore which was a long-standing demand of Bengaluru residents. The work on the primary section is already underway and this mission will likely be accomplished within the yr 2024-25. Grants of ₹1,350 crore from the Central authorities and ₹1,000 crore from the State authorities will likely be supplied within the present yr.

The work order for Bengaluru suburban railway mission between Chikkabanavara and by corridor-2 by way of duct for ₹860 crore has been issued and works have commenced.

At current, the Bengaluru Metro Rail scheme is operational in a 56-km community. The line connecting the Central Silk Board junction and Kempegowda International Airport of 58.19 km size with 30 stations is underneath progress at a quick tempo. There is a plan to operationalise a 40.15-km size metro route within the coming years.

Waste administration, flood management, water provide

BBMP garbage trucks on the way to the landfill in Mittaganahalli quarry pit, in north Bengaluru. file photo

BBMP rubbish vans on the way in which to the landfill in Mittaganahalli quarry pit, in north Bengaluru. file picture
| Photo Credit:
MURALI KUMAR Ok

Several actions will likely be taken for processing of waste produced within the metropolis. Auto tippers and compactors designed for assortment of dry waste and moist waste in the identical automobile will likely be operationalised. For processing of waste, a contemporary technology-based odourless waste processing unit will likely be established in every ward.

Thrust will likely be given to course of the waste regionally by mandating the producers of the massive amount of waste, together with industrial complexes, hospitals and motels, to course of the waste at their degree itself.

To mitigate the ill-effects of local weather change and management floods in Bengaluru, a mission help of the World Bank at a price of ₹3,000 crore will likely be applied. Sluice gates will likely be put in in any respect the tanks to manage the flood state of affairs underneath this scheme. It will assist in controlling the pace and amount of movement of water.

The works of Cauvery Water Supply Scheme stage-5 has been undertaken at an estimated price of ₹5,500 crore with monetary help of JICA. These works will likely be accomplished within the yr 2023-24. Completion of 775 MLD capability scheme will assist in offering potable water to 50 lakh folks of town.

Financial help of ₹200 crore will likely be given to Bengaluru Water Supply and Sewerage Board from the state authorities for implementing the second section of offering water to 11 villages coming underneath BBMP.

At current, 1,850 MLD effluents are being produced in Bengaluru, out of which 1,500 MLD effluents therapy capability has been created. The capability of 350 MLD will likely be added to deal with all of the effluents within the metropolis.

Construction works of 4 new effluent therapy crops with whole capability of 440 MLD at price of ₹1,200 crore have been taken up underneath mega metropolis revolving fund.

More BBMP faculties, Namma Clinics

To present well being companies at an reasonably priced price, aside from Namma Clinics in 243 wards and 27 sensible digital clinics which had been accepted in 2022-23, 50 dialysis beds and 300 bedded super-speciality amenities have been established, Mr. Bommai stated in his speech. To enhance the well being administration system, he proposed to re-constitute the Mahanagara Health Administration as ‘Bengaluru Health Systems’.

Twenty Bengaluru public faculties announced within the 2022-23 price range have been applied. Further, a scheme for development of BBMP faculties at a price of ₹180 crore is ready underneath Amrutha Nagarothana Scheme and the works will likely be accomplished within the yr 2023-24.

Namma Clinic launched by the BBMP at Mahalakshmi Layout in Bengaluru. file photo

Namma Clinic launched by the BBMP at Mahalakshmi Layout in Bengaluru. file picture
| Photo Credit:
SUDHAKARA JAIN

Ten lakh saplings have been planted yearly upto 2022-23. From 2023-24 onwards, this will likely be elevated to fifteen lakh saplings. The chief minister additionally announced a proposal to determine three high-tech nurseries in coordination with the forest division.

To forestall the encroachment of BBMP property and to make sure its safety, fencing, erecting boards and surveillance by way of GPS software program will likely be undertaken at a price of ₹35 crore.

To infuse religion within the weaker sections of the society, particularly girls, the Safe City Project underneath the Nirbhaya scheme is being applied on a struggle footing with 4,100 cameras already put in in 1,640 locations. Safety measures taken will likely be monitored by offering entry to those cameras to the built-in management and command centre. A grant of ₹261 crore will likely be supplied to finish this scheme within the present yr.



Source hyperlink