Watch Live: ISROs Gaganyaan Flight Test Vehicle Abort Mission At 8 AM

0
13
Watch Live: ISROs Gaganyaan Flight Test Vehicle Abort Mission At 8 AM


Taking a serious step in direction of a human-space mission, the Indian Space Research Organisation (ISRO) is all set to hold out the Flight Test Vehicle Abort Mission at 8 am immediately at Sriharikota in Andhra Pradesh. In a Twitter submit, ISRO mentioned, “The test is scheduled for October 21, 2023, at 0800 Hrs. IST from the First launchpad at SDSC-SHAR, Sriharikota. It will be a short-duration mission and the visibility from the Launch View Gallery (LVG) will be limited.” 

Mission Definition

Defining the mission, ISRO mentioned, “In-flight Abort Demonstration of Crew Escape System (CES) at Mach number 1.2 with the newly developed Test Vehicle followed by Crew Module separation & safe recovery.”

Mission Objective

Defining the mission object, ISRO mentioned that three key issues might be achieved with this check. The targets are – Flight demonstration and analysis of Test Vehicle sub-systems, Flight demonstration and analysis of Crew Escape System together with numerous separation techniques and Crew Module traits & deceleration techniques demonstration at larger altitude & restoration.

Abort Scenario Testing

The check flight is designed to copy an abort situation that happens in the course of the ascent part. At an altitude of roughly 17 kilometres, the crew escape techniques, together with crude modules, might be indifferent from the check automobile. Following this, the autonomous abort sequence will provoke, beginning with the separation of the crew escape techniques and the deployment of a collection of parachutes. Ultimately, the crew module will contact down safely within the sea, roughly 10 kilometres off the coast of Sriharikota.

Gaganyaan Abort Mission Live Streaming Here

Prime Minister Narendra Modi has earlier chaired a high-level assembly to evaluate the progress of India’s Gaganyaan mission and to stipulate the way forward for India’s area exploration applications, the PMO mentioned. It was famous that round 20 main checks, together with 3 uncrewed missions of the Human Rated Launch Vehicle (HLVM3) are deliberate. The first demonstration flight of the Crew Escape System Test Vehicle is scheduled immediately. The prime minister’s evaluate assembly evaluated the mission’s readiness, affirming its launch in 2025.

The Gaganyaan mission comes after ISRO’s back-to-back success of Chandrayaan-3 and Aditya L1 solar mission. 





Source hyperlink